Banner
 Intranet Home Page Administration Company Information Client Information Safety Management Environmental
Quality Assurance  Industrial Relations  Marketing  Forms  Training  Library and Links 
Mungana Mine
  AUCTUS MUNGANA MINE SITE

The Mungana Mine site is situated 16kms west of Chillagoe, Far North Queensland. The Mungana Underground Mine was named after the adjacent ghost mining town of Mungana, which was first surveyed on 26th June 1901 to serve the nearby mines of Girofla, Lady Jane, Dorothy, Red Dome and Griffiths that operated intermittently from the late 1800s to 1926.

Thereafter, various mining operations have taken place. In 1986, Elders IXL Ltd developed an open cut mine over the old Red Dome workings, which ran until 1997, and produced about 1 million ounces of gold and 35,000 tonnes of copper. In 1992, Nuigini Mining commenced drilling at Mungana to identify additional feedstock for Red Dome, culminating in a published open-pit reserve in 1994. Following the closure of the Red Dome pit in 1997, Kagara Ltd continued exploration at Mungana.

In 2006, Karaga Ltd commenced underground development of the base metal deposit. During operations the mine was developed to a depth of 700 vertical metres, with 700,000 tonne of ore extracted grading 1.8%Cu, 1%Pb, 11.1%Zn, 1g/t Au and 80g/t Ag. Site improvements made by Kagara Ltd included a modern site office complex, change rooms, workshop, mains power supply, ROM pad, and partially completed 600kt/annum processing facility and tailings dam.

In 2012, diminishing commodity prices and a high exchange rate saw Kagara Ltd enter administration during which time the Mungana Mine (and associated leases and assets) were sold to Atherton Resources Ltd (formally Mungana Gold Mines).

In 2015, Auctus Minerals (parent company to Auctus Resources) conducted a successful take-over of Atherton Resources with a view to re-establishing and expanding operations at the Mungana mine by transverse sublevel caving. Development is set to recommence in October 2016, and first production ore scheduled for January 2017

Since acquiring the site in 2015, Auctus Resources has set and met several key milestones.

Auctus Supplied Documents:

AR-OG-SOP-OHS-0001 Safety Management Plan
KV-OG-MSP-OHS-0001 Kine Vol Emergency Management Plan
MUN-OG-MSP-OHS-0001 Mungana Emergency Action Plan
\AR-OG-MSP-OHS-0003 Emergency Response Plan
AR-OG-SOP-CRP-0001 Contractor Management Plan
AR-OG-SOP-OHS-0005 Fatigue Management Plan
AR-OG-SOP-OHS-0013 Traffic Managment Plan
AR-OG-SOP-OHS-0034 Lead Management Plan
AR-OG-PLC-OPS-0001 Change Management Procedure
AR-OG-PLC-0HS-0002 Drug and Alcohol Policy
AR-VL-REG-ADM-0001 Chillagoe Village Occupancy Rules
AR-OG-RPT-HRM-0001 Visitor Information Pack
AR-OG-PLC-OHS-0001 PPE Policy
AR-OG-SOP-OHS-0037 Loading and Unloading of Mobile Equipment
AR-OG-SOP-OHS-0008 Isolation and Tagging Procedure
AR-OG-SOP-OHS-0017 Hot Work Procedure
AR-OG-SOP-OHS-0019 Working at Height Procedure
AR-UG-SOP-UGM-0018 Confined Space Entry Procedure
AR-OG-SOP-OHS-0038 Drivers Induction Procedure
AR-OG-SOP-OHS-0012 Operate Light Vehicle Procedure
AR-OG-SOP-ENV-0007 Environmental Awareness Packages
CS-337 Structural Steel Technical Specification
CS-347-002B Protective Coating Technical Specification